Tuesday, March 17, 2015

Cycling-Day 1-Tama River(95.7km)

Good sunny day.


Day 1, 155days for cycling, total distance 11,451.3km, total climb 157,738m
Tama River 10:19-15:45
Distance today 95.7km, climb 127m, duration 4:24, avg speed 21.8km/h, burned 2,818kcal
Gear: Eurasia 520 Today's route

Nice spring day for riding for the first run.

Marukobashi bridge.

Today I attempted to Enoshima, but I needed to be back early evening.

On Tamagawa for quick riding.

Cherry blossom along the river.


There was a construction along the river.

The trail goes here and there, which made me stressful.

At Yotsuya, where a convenience store.

It was still vacant.

I reached to Hamura dam in 2 hours 20 minutes.

The riding was exhausted.

The construction really annoys me.


"Kazenomiti", or the road of the winds.

Indeed, it was always windy.

0 Comments:

Post a Comment

<< Home